from $280.50

If you require a re-inspection please ensure all items in the failed pre- connection inspection report are satisfied. Fees are applicable for every re-inspection, so please ensure you are compliant.

Altogether will need access to your home to satisfy all the pre-connection assessment criteria.

Please ensure you provide access details to avoid a re-inspection.

Please note:
• If your home passes inspection we will notify you and your builder of your connection date.
• If your home does not pass the inspection, we will notify you and your builder by outlining what needs to be fixed.
• Your wastewater collection tank must be free and clear of all liquid and debris prior to connection. If required, book in a tank pump out now to ensure your connection goes smoothly. If the tank is not free of liquid and debris at the time of connection, an incomplete connection fee will be charged.

booking options:
related products

pump out
$607.44

Prior to connection, you may require your tank to be pumped out. Please note that additional fees apply for out of hours emergency pump outs (before 7am and after 3pm).

pre-connection inspection (with optional pump out)
$0.00

Once construction of your home is complete, you can start getting ready to move in by requesting a water and wastewater pre-connection inspection.

 

My Cart

your shopping cart is empty.

please click here to visit the shop.